Case study

Refrigeration condenser fouling detection

Cooling towersEnergy & electricityFood & Beverage ProcessingControlled Environment Agriculture (Greenhouses)

Head pressure rose while load remained constant, revealing condenser fouling and quantifying its energy cost.

A refrigeration condenser’s head pressure rose while the cooling load stayed steady. We compare pressure with load to show the increasing energy penalty and help the team decide when cleaning is needed.

What the data showed

Hover or arrow-key across the trace to read any interval. The flagged point is the one that started the conversation.

Refrigeration condenser fouling detection
CLEAN CONDENSER
HEAD PRESSURE PER UNIT LOAD · 90 DAYS · DAILY
Chart data
IntervalRack 1 (kPa/kW)
D113
D212
D312
D412
D513
D613
D712
D813
D913
D1013
D1113
D1213
D1313
D1413
D1513
D1613
D1713
D1813
D1913
D2013
D2113
D2213
D2313
D2413
D2513
D2613
D2713
D2813
D2913
D3013
D3113
D3213
D3313
D3414
D3513
D3613
D3713
D3814
D3914
D4014
D4114
D4214
D4314
D4414
D4514
D4614
D4714
D4814
D4914
D5014
D5114
D5214
D5314
D5414
D5514
D5614
D5714
D5814
D5914
D6014
D6114
D6214
D6314
D6414
D6514
D6615
D6714
D6814
D6914
D7015
D7115
D7215
D7315
D7415
D7515
D7615
D7715
D7815
D7915
D8015
D8115
D8215
D8315
D8415
D8515
D8615
D8715
D8815
D8915
D9015
Before and after, in words
BeforeA cleaning schedule based on the calendar
AfterA cleaning schedule based on the measured penalty

Background

A food storage and processing facility depends on refrigeration to maintain its operating conditions. As the condenser fouls, the compressor has to work harder to provide the same cooling. Our review follows that relationship over time, using the refrigeration load as the context for the pressure reading.

The problem

The system can continue operating while its electricity demand rises. A cleaning schedule based only on the calendar gives the team little connection between the planned work and the condenser’s current condition. The increasing effort can therefore remain part of everyday operation until someone looks at pressure alongside the load.

How we found it

We use a head pressure transducer on the refrigeration circuit and monitor compressor current. The dashboard follows the ratio of head pressure to load, with a threshold for cleaning. A rising ratio while load remains constant makes the developing fouling visible and connects the maintenance question to the measured operating penalty.

What changed

The cleaning decision follows the measured penalty rather than the calendar alone. The team can review the pressure and load trend to see why the condenser needs attention. That gives maintenance a specific condition to act on and an operating record to use when discussing the timing of the work.

The lesson

We keep the load beside the pressure reading so a change has context. For this system, the useful signal is increasing pressure for the same cooling duty. Continuing to follow the ratio after cleaning gives the team a way to review the effect of maintenance and watch for renewed drift, with the next cleaning decision tied to the equipment’s measured condition.

What changed

Before

A cleaning schedule based on the calendar

After

A cleaning schedule based on the measured penalty

Head pressurevs. load

The ratio drifts long before the system trips on high pressure.

Find out what’s hiding in your factory.

Every study on this site started with somebody walking a floor and asking what the numbers actually were. Our team will do the same on yours and tell you honestly what we find.