Funding

Funding may be available for your project.

We track relevant funding programs, help your team identify likely matches and work with you to prepare the information needed for an application.

Program details change. Always confirm with the program before you budget. We identify the source and last-reviewed date for every listing. Quantify is not affiliated with, or paid to list, these programs.

Recent funding wins

Enable JavaScript to search or filter. All programs are listed below, with federal programs first.

31 of the 63 were in an open or always-open intake when we last checked, and 4 close within 90 days.

Funding programs

  • FederalAlbertaNo stated deadline

    Strategic Energy Management for Industry (SEMI)

    Emissions Reduction Alberta (ERA), with Government of Alberta and NRCan Waitlist only

    AmountAssessments/audits up to $50,000; EMIS $50,000–$250,000 (by consumption); SEM training up to $100,000; capital retrofits up to $1,000,000 per facility, generally 50% of eligible costs for for-profits

    DeadlineNone stated on the source page

    A $70M program for Alberta industrial/manufacturing facilities covering energy assessments and audits, Energy Management Information Systems (monitoring), strategic energy management training and capital retrofits.

    Status note: Re-verified 2026-08-25: unchanged, "UPDATE: WAITLISTS OPEN FOR ALL ACTIVITIES". Energy Assessments and Audits, EMIS, Strategic Energy Management and Capital Retrofits are all waitlist-only, and SEM is explicitly closed to new applications. Funding is limited and not guaranteed; the program runs to March 31, 2027 or until funds are allocated.

    Other / multi-utilityElectricityNatural gas

    Official program pageeralberta.caUpdated What this covers

  • FederalNationalNo stated deadline

    Accelerated Capital Cost Allowance: Classes 43.1 and 43.2 (and CRCE)

    Natural Resources Canada / Canada Revenue Agency Always open

    AmountClass 43.1: eligible equipment written off at 30 percent per year on a declining balance basis. Class 43.2: 50 percent per year, for equipment acquired after February 22, 2005 and before 2025. Enhanced first-year allowance: a 100 percent deduction, in phase-out for property available for use after 2023.

    DeadlineNone stated on the source page

    Accelerated depreciation for equipment that generates energy from renewables or waste fuels, or that conserves energy by using fuel more efficiently; the energy-conservation limb being the one that matters for factory retrofits. Canadian Renewable and Conservation Expense lets certain development and start-up costs be deducted in full in the year incurred.

    Status note: Timing: Class 43.2 (the 50% rate) applies only to equipment "acquired after February 22, 2005, and before 2025", so for a 2026 purchase the live class is 43.1 at 30 percent. The enhanced first-year allowance covers property acquired after November 20, 2018 and available for use before 2028 and is already in phase-out. Not an application-based program, claimed on the tax return, so no intake risk. NRCan's own page notes the overlap with the Clean Technology ITC. The Technical Guide linked from the page is the 2019 edition; the "Class 43.1, Class 43.2 and CRCE News" section carries anything later. Ask your accountant whether your metering or monitoring equipment qualifies.

    ElectricityNatural gasOther / multi-utility

    Official program pagenatural-resources.canada.caUpdated What this covers

  • FederalNationalNo stated deadline

    Building Retrofits Initiative

    Canada Infrastructure Bank (CIB) Intake status unconfirmed

    Amountvaries (the CIB program page publishes no financing terms, rates or minimum project size)

    DeadlineNone stated on the source page

    Low-cost long-term CIB financing for deep energy retrofits of privately owned commercial, industrial and multi-unit residential buildings, delivered directly, through partner financial institutions, or through service-provider aggregators.

    Status note: Industrial facilities are eligible through three delivery streams. The CIB does not publish a minimum project size, financing terms or intake status on this page. Ask investments@cib-bic.ca about the minimum investment and emissions-reduction requirements.

    Other / multi-utility

    Official program pagecib-bic.caUpdated What this covers

  • FederalNationalNo stated deadline

    Clean Technology Investment Tax Credit (Clean Technology ITC)

    Canada Revenue Agency (with Natural Resources Canada technical guidance) · Clean Economy Investment Tax Credits Always open

    AmountUp to 30% of the capital cost of clean technology property acquired and available for use from March 28, 2023 to December 31, 2033; up to 15% for property available for use in 2034. The credit is refundable.

    DeadlineNone stated on the source page

    A refundable federal tax credit on the capital cost of new clean technology property, claimed on the corporate return. For a factory the relevant categories are air-source and ground-source heat pumps, active solar heating, fixed-location electrical energy storage, and on-site solar, wind or water generation.

    Status note: The CRA states: "The Clean Technology ITC is a refundable tax credit for capital invested in the adoption and operation of new clean technology property in Canada from March 28, 2023, to December 31, 2034." 30% through 2033, 15% in 2034, unavailable after 2034. A reduced rate applies unless the employer elects to meet the federal labour requirements. Cannot be stacked with the CCUS ITC on the same property, though different Clean Economy ITCs can apply to different property in one project. Like OMMITC, this is claimed on a return with no application window and therefore no intake risk. Finance Canada opened consultations on a possible domestic-content requirement in February 2026, worth watching. Ask your accountant whether your equipment qualifies.

    ElectricityOther / multi-utility

    Official program pagecanada.caUpdated What this covers

  • FederalNationalNo stated deadline

    FedDev Ontario: Funding for businesses in southern Ontario

    Federal Economic Development Agency for Southern Ontario · FedDev Ontario Always open

    Amountvaries (no amounts stated on the official page)

    DeadlineNone stated on the source page

    Repayable contributions helping southern Ontario businesses adopt cutting-edge technology and equipment to enhance productivity, commonly used by manufacturers for automation, ERP/MES and digital adoption.

    Status note: Re-verified 2026-08-25: the page states "FedDev Ontario is accepting applications", with no intake dates or pause notice. Contact FedDev Ontario for funding amounts and repayment terms.

    Other / multi-utility

    Official program pagefeddev-ontario.canada.caUpdated What this covers

  • FederalNationalNo stated deadline

    Financial assistance for ISO 50001 in commercial and institutional buildings

    Natural Resources Canada (NRCan) Closed between intakes

    AmountUp to 60% of eligible costs for for-profit organizations and up to 75% for not-for-profits, to a maximum of $40,000 per building; maximum contribution to an organization or group of affiliates is $200,000 per fiscal year

    DeadlineNone stated on the source page

    Cost-shared federal funding to implement or certify an ISO 50001 energy management system. Eligible costs explicitly include data collection, software licences, and instrumentation and metering systems, but exclude installation and energy retrofits.

    Status note: Closed at retrieval, "The call for proposals is closed." Eligible costs include: instrumentation and metering systems, data collection and software licences, at up to 60% for a for-profit. The funding period runs April 2026 to March 2029, with projects due by March 31, 2029. Note the scope is COMMERCIAL AND INSTITUTIONAL BUILDINGS; the industrial equivalent sat inside GIFMP, which is also closed.

    ElectricityNatural gas

    Official program pagenatural-resources.canada.caUpdated What this covers

  • FederalNationalNo stated deadline

    Green Industrial Facilities and Manufacturing Program (GIFMP)

    Natural Resources Canada (NRCan) Closed between intakes

    Amountvaries (no amounts stated on current program page)

    DeadlineNone stated on the source page

    Cost-shared funding for energy-efficiency and energy-management projects at industrial facilities, including training, energy assessments and audits, and retrofit capital investments.

    Status note: Re-verified 2026-08-25: BOTH tracks (Industrial Facility and Energy Efficiency Solutions) still show status "Closed", with no reopening date published. Funding is released in periodic intakes, so treat this as "watch for the next intake", and note that GIFMP money is currently reaching Ontario factories indirectly, because NRCan funds the industrial EMIS incentive inside the Save on Energy Retrofit program.

    Other / multi-utility

    Official program pagenatural-resources.canada.caUpdated What this covers

  • FederalNationalNo stated deadline

    NGen: Advanced Manufacturing project funding (Global Innovation Cluster)

    Next Generation Manufacturing Canada (NGen) · NGen Waitlist only

    Amountvaries by program

    DeadlineNone stated on the source page

    Cost-shared collaborative project funding for advanced-manufacturing and digital-transformation projects; the Industrial AI Readiness Program is the currently open stream.

    Status note: Re-verified 2026-08-25: unchanged; the Industrial AI Readiness Program is the only stream listed as open; every other stream (Advanced Manufacturing Technology, Sustainable Manufacturing, EV Manufacturing Value Chain, and the rest) is listed as closed. No deadlines or amounts are published on the funding index page.

    Other / multi-utility

    Official program pagengen.caUpdated What this covers

  • FederalNationalNo stated deadline

    NRC Industrial Research Assistance Program (NRC IRAP)

    National Research Council Canada Intake status unconfirmed

    Amountvaries (project contributions negotiated with an Industrial Technology Advisor)

    DeadlineNone stated on the source page

    Advisory services and cost-shared funding for SME technology-innovation projects, including AI, clean technology and digital/Industry 4.0 development work.

    Status note: Active, but in transition: IRAP is slated to move from the NRC into the Canada Innovation Corporation around 2026-27, so branding/URLs may change.

    Other / multi-utility

    Official program pagenrc.canada.caUpdated What this covers

  • FederalNationalNo stated deadline

    Strategic Response Fund (successor to the Strategic Innovation Fund)

    Innovation, Science and Economic Development Canada (ISED) Intake status unconfirmed

    Amountvaries (large-scale projects; no minimum stated on page)

    DeadlineNone stated on the source page

    Contributions toward large-scale, transformative industrial projects, including cleantech and advanced-manufacturing innovation and tariff-response support for affected sectors.

    Status note: The Strategic Innovation Fund (SIF) has been superseded; the official page now describes the Strategic Response Fund (SRF), active in 2026 with targeted calls for proposals.

    Other / multi-utility

    Official program pageised-isde.canada.caUpdated What this covers

  • ProvincialAlbertaNo fixed deadline

    ERA Technology Funding (Continuous Intake Program)

    Emissions Reduction Alberta (ERA) Always open

    Amountvaries by competition

    DeadlineRolling intake

    Funding for pilot/demonstration and deployment of emissions-reducing technologies in Alberta industry, via a continuous-intake stream plus periodic themed competitions (e.g., Fuel Innovation Fund).

    Status note: Continuous Intake Program, Lab Services Incentive pilot and Fuel Innovation Fund listed as open at retrieval; the former Energy Savings for Business (ESB) rebate program has ended.

    Other / multi-utility

    Official program pageeralberta.caUpdated What this covers

  • ProvincialBritish ColumbiaNo stated deadline

    Clean Industry Fund (formerly CleanBC Industry Fund)

    BC Ministry of Environment and Climate Change Strategy · CleanBC Closed between intakes

    Amountvaries (no amounts stated on the current apply-for-funding page; each stream publishes its terms in its own request for proposals)

    DeadlineNone stated on the source page

    Reinvests part of British Columbia's industrial carbon price into emissions-reduction projects at industrial operations, through three streams, Emissions Performance, Innovation Accelerator, and Feasibility Studies. The 2026 intake has closed.

    Status note: Closed at retrieval, "The 2026 Clean Industry Fund Intake is now closed." Stream close dates: Emissions Performance May 22, 2026; Innovation Accelerator June 19, 2026; Feasibility Studies June 26, 2026. The program has an annual spring intake. Contact CleanBCIndustryFund@gov.bc.ca about the next call.

    ElectricityNatural gasOther / multi-utility

    Official program pagewww2.gov.bc.caUpdated What this covers

  • ProvincialOntarioCloses 15 Jun 2027

    Industrial Conservation Initiative (Class A global adjustment)

    IESO (Independent Electricity System Operator), Ontario Intake open · Deadline 2027-06-15

    AmountNot a grant; a change in how global adjustment is billed. A Class A customer's global adjustment is set by its share of Ontario's five highest system demand hours in the 12-month base period, so the saving is a function of how far peak demand is cut, not a published figure.

    DeadlineDeadline 2027-06-15

    Ontario's peak-shaving mechanism: eligible large electricity customers elect into Class A and are billed global adjustment on their contribution to the province's five peak demand hours over a May-to-April base period, instead of on total consumption. Managing the bill means predicting and curtailing on those five hours.

    Status note: This program changes how global adjustment is billed. Interval metering and peak prediction help facilities manage demand. Election is ANNUAL and the window is narrow: eligible customers opt in (or, above 5 MW, opt out) by JUNE 15 for the base period that runs May 1 to April 30. The June 15, 2026 election for the 2026-27 base period has passed; the recorded deadline is the NEXT election, June 15, 2027. Existing Class A facilities keep their status unless the customer opts out. Governed by Ontario Regulation 429/04. The election date comes round every June.

    Electricity

    Official program pageieso.caUpdated What this covers

  • ProvincialOntarioNo stated deadline

    Ontario Automotive Modernization Program (O-AMP)

    Government of Ontario (Ministry of Economic Development, Job Creation and Trade) Closed between intakes

    AmountUp to 50% of eligible project costs to a maximum of $150,000

    DeadlineNone stated on the source page

    Grants for small/medium automotive parts suppliers to adopt technology (ERP, production tracking/monitoring, CAD/CAM) and implement lean manufacturing.

    Status note: Re-verified 2026-08-25: still closed: "Round 7 is now closed. Information on the next intake will be announced at a later date." Contact o-amp@ontario.ca for the next round.

    Other / multi-utility

    Official program pageontario.caUpdated What this covers

  • ProvincialOntarioNo stated deadline

    Ontario Made Manufacturing Investment Tax Credit (and Expanded OMMITC)

    Government of Ontario Always open

    Amount10% base rate (up to $2M/year); enhanced 15% rate for expenditures May 15, 2025 – Dec 31, 2029 (up to $3M/year), on up to $20M of eligible expenditures per taxation year. The CCPC credit is refundable; the Expanded OMMITC for non-CCPCs is a 15% NON-refundable credit.

    DeadlineNone stated on the source page

    A corporate income tax credit on capital investments in Ontario manufacturing, Class 53/43 machinery and equipment used in manufacturing or processing, and Class 1 buildings used for manufacturing or processing. Refundable for CCPCs; the expanded credit for non-CCPCs is non-refundable.

    Status note: Re-verified 2026-08-25. Always available, claimed on the T2 corporate return via CRA, no application window and therefore no intake risk. Expenditures must be incurred on or before December 31, 2029; the credit is repealed effective January 1, 2030. Ask your accountant whether your metering or monitoring equipment qualifies as Class 53.

    Other / multi-utility

    Official program pageontario.caUpdated What this covers

  • ProvincialOntarioNo fixed deadline

    Ontario Together Trade Fund (OTTF)

    Government of Ontario (Ministry of Economic Development, Job Creation and Trade) Always open

    AmountGrants or loans in the range of 10–20% of eligible costs to a maximum of $5 million; up to 75% of eligible costs where exceptional benefits are demonstrated; up to 30% of a loan (to a maximum of $1.5 million) may be forgiven

    DeadlineRolling intake

    Tariff-response capital funding: equipment and machinery, facilities and infrastructure, capacity expansion and reshoring for Ontario businesses hit by U.S. trade disruption. Continuous intake rather than fixed windows.

    Status note: The page states "The intake period is continuous which means applicants can submit their application any time while the program is open", but it was last updated December 10, 2025 and carries no statement confirming it is still open in August 2026, and the fund closes when its budget is exhausted. Budget was $50 million over three years from 2025-26, increased by a further $100 million in November 2025 to $150 million. Confirm current availability with the provider before planning an application. The tariff-sector test is the real filter: this is a fit for a metal fab or auto supplier, not for a general manufacturer. The usual funding range is 10–20%; 75% applies only in exceptional cases.

    Other / multi-utility

    Official program pageontario.caUpdated What this covers

  • ProvincialOntarioCloses in 42 days · 5 Nov 2026

    Regional Development Program: Advanced Manufacturing and Innovation Competitiveness (AMIC) Stream

    Government of Ontario (Ministry of Economic Development, Job Creation and Trade) · Regional Development Program Intake open · Deadline 2026-11-05

    AmountA loan of up to 15% of eligible costs to a maximum of $5 million, interest free during the project period, with up to 30% of the loan (to a maximum of $500,000) forgivable on meeting targets; or a grant of $500,000 for small companies in rural communities, or $1.5 million for strategic foreign-direct-investment projects

    DeadlineDeadline 2026-11-05

    The province-wide arm of the Regional Development Program: capital equipment, technology adoption and skills development for advanced manufacturers anywhere in Ontario, including the GTA.

    Status note: Application Period 8 is OPEN NOW, June 30 – November 5, 2026; Period 9 follows January 28 – April 27, 2027. Unlike SWODF/EODF this stream "includes all of Ontario", so it is the GTA manufacturer's route into the Regional Development Program. The sector list is narrow. The page names aerospace, automotive, chemical, information and communications technology (ICT), life sciences and steel. FOOD AND BEVERAGE MANUFACTURING IS NOT ON THAT LIST, so a brewery or a food plant is not eligible. Start with the online eligibility self-screener, then a provincial advisor, then a full application through Transfer Payment Ontario.

    Other / multi-utility

    Official program pageontario.caUpdated What this covers

  • ProvincialOntarioClosed 23 Sep 2026

    Regional Development Program: Southwestern and Eastern Ontario Development Funds

    Government of Ontario (Ministry of Economic Development, Job Creation and Trade) · Regional Development Program Intake open · Closed 2026-09-23

    AmountBusiness stream: a loan of up to 15% of eligible costs to a maximum of $5 million, interest free during the project period, with up to 30% of the loan (to a maximum of $500,000) forgivable on meeting targets; or a grant of up to 15% to a maximum of $500,000 for small rural companies or $1.5 million for strategic foreign-direct-investment projects

    DeadlineClosed 2026-09-23

    Capital funding for established businesses investing in new equipment, technology adoption and process improvement in southwestern or eastern Ontario. Applications run in fixed windows rather than continuously.

    Status note: Application Period 23 is OPEN NOW and runs June 30 – September 23, 2026. The geography is the opposite of most entries here: southwestern Ontario covers Brant, Bruce, Chatham-Kent, Dufferin, Elgin, Essex, Grey, Haldimand, Huron, Lambton, Middlesex, Niagara, Norfolk, Oxford, Perth, Simcoe, Waterloo and Wellington; eastern Ontario covers Frontenac, Haliburton, Hastings, Kawartha Lakes, Lanark, Leeds and Grenville, Lennox and Addington, Muskoka, Northumberland, Ottawa, Peterborough, Prescott and Russell, Prince Edward, Renfrew, and Stormont Dundas and Glengarry. THE GTA IS IN NEITHER; a Toronto, Peel, York, Halton or Durham plant must use the AMIC stream instead. Agriculture, mining, retail and construction are ineligible sectors. The EODF page carries the same terms and the same window; its URL is https://www.ontario.ca/page/eastern-ontario-development-fund. The next window after this one opens in early 2027.

    Other / multi-utility

    Official program pageontario.caUpdated What this covers

  • ProvincialOntarioCloses 31 Aug 2027

    Save on Energy: BizEnergySaver (Toronto and Ottawa local initiative)

    IESO (Independent Electricity System Operator), with Toronto Hydro and Hydro Ottawa · Save on Energy Intake open · Deadline 2027-08-31

    AmountSpecified $/unit instant discount, up to 100% of eligible costs (incl. installation); free assessment; per the program page most VFD upgrades come out free

    DeadlineDeadline 2027-08-31

    A free facility assessment plus an instant invoice discount (up to the full eligible cost) on LED lighting upgrades with integral occupancy sensors, high/low bay LED fixtures, variable frequency drives for pumps and fans, and parking-garage exhaust and CO controls. Runs only in Toronto and Ottawa, to relieve local electricity system constraints.

    Status note: Verified open 2026-08-25. Check the cost coverage and eligible locations. (1) The discount is "Specified $/unit, up to 100% of eligible costs (incl. installation)"; a per-unit figure capped at 100%, NOT a guaranteed 100%: "There may be some costs that are not covered by the BizEnergySaver Program (e.g., additional wiring, by-pass for VFD, certain TSSA costs, etc.)." (2) It is the CITY OF TORONTO, not the GTA, "As of July 23, 2026, the program has expanded to all of Toronto. All postal codes beginning with 'M' are now eligible", so Mississauga, Brampton, Vaughan, Markham, Oakville, Pickering and the rest of the "L" postal codes are outside it. August 31, 2027 is an INSTALLATION-COMPLETION deadline ("eligible installations in Ottawa and Toronto must be completed by August 31, 2027"), not an application deadline, so the practical booking window closes earlier. Per-measure discount amounts live in the BizEnergySaver Program Requirements PDF linked from the page.

    Electricity

    Official program pagesaveonenergy.caUpdated What this covers

  • ProvincialOntarioCloses 31 Dec 2027

    Save on Energy: Energy Performance Program

    IESO (Independent Electricity System Operator), Ontario · Save on Energy Intake open · Deadline 2027-12-31

    Amount$0.30/kWh for summer peak savings (June 1 – September 30, 3 p.m. to 9 p.m. EDT) and $0.08/kWh for non-summer-peak savings, paid annually for three years; rates doubled effective January 1, 2025

    DeadlineDeadline 2027-12-31

    A pay-for-performance program that pays for whole-facility electricity savings measured against a modelled baseline, rather than for a named piece of equipment, so operational and behavioural changes earn money alongside capital projects. Entry requires twelve months of hourly interval meter data per facility.

    Status note: Verified open 2026-08-25, no waitlist or pause. The approval deadline is: "Three years of annual pay-for-performance incentives are available for applications approved by December 31, 2027"; note it is the APPROVAL date that must fall inside the window, so applications need to go in materially earlier. The entry requirement is twelve months of hourly interval data: a factory without it cannot apply, and the program's own portal then does baseline modelling and ongoing facility performance monitoring. Contact info@energyperformanceprogram.ca / 1-888-852-2440.

    Electricity

    Official program pagesaveonenergy.caUpdated What this covers

  • ProvincialOntarioNo stated deadline

    Save on Energy: Existing Building Commissioning Program (EBCx)

    IESO (Independent Electricity System Operator), Ontario · Save on Energy Intake open

    AmountInvestigation phase: up to $0.06 per square foot of building area, to a maximum of $50,000 per application or 75% of the costs paid. Implementation and persistence phases: $0.03 per kWh of confirmed (then persisting) savings, each capped at 30% of the facility's annual electricity consumption or $50,000, whichever is lower.

    DeadlineNone stated on the source page

    Funds a three-phase recommissioning of an existing building: investigation, implementation of the identified measures, then a year of monitoring to prove the savings persist. Baseline models and measurement and verification documentation are required throughout.

    Status note: Verified open 2026-08-25; no intake window or end date published. Eligibility: the 750,000 kWh threshold explicitly EXCLUDES energy consumed by industrial and manufacturing processes, so a factory qualifies on its building loads alone or not at all. The persistence phase funds a year of monitoring to confirm that savings continue.

    Electricity

    Official program pagesaveonenergy.caUpdated What this covers

  • ProvincialOntarioNo stated deadline

    Save on Energy: Expanded Energy Management Program (SEM / Energy Manager / EMIS)

    IESO (Independent Electricity System Operator), Ontario · Save on Energy Intake open

    AmountEnergy manager: up to 50% of salary to $100,000 per facility per year; industrial EMIS: up to $50,000 (facilities up to 400,000 GJ/yr) or up to $250,000 (above 400,000 GJ/yr), in both cases up to 50% of eligible project costs

    DeadlineNone stated on the source page

    Co-funds a dedicated energy manager's salary, provides Strategic Energy Management coaching/cohorts, and funds installation of Energy Management Information Systems (EMIS), i.e. energy monitoring, at industrial facilities.

    Status note: Re-verified open 2026-08-25, with no waitlist, no stated application deadline. All industrial program activities funded by NRCan must be COMPLETED by March 31, 2027, so allow time to finish the work. Industrial eligibility thresholds: SEM at least 20,000 GJ/yr (all fuels), Energy Manager at least 50,000 GJ/yr, with 12 consecutive months of energy data in the past 24. Replaced the legacy Energy Manager program.

    ElectricityOther / multi-utility

    Official program pagesaveonenergy.caUpdated What this covers

  • ProvincialOntarioNo stated deadline

    Save on Energy: Instant Discounts Program

    IESO (Independent Electricity System Operator), Ontario · Save on Energy Intake open

    AmountPoint-of-sale discounts from $2 to $80 per unit depending on product (for example up to $2 on a 4' T5 LED tube, up to $40 and up to $80 on high bay fixtures); total discount offered may vary by participating distributor

    DeadlineNone stated on the source page

    An upfront discount taken off the invoice at participating electrical distributors on LED tubes and U-bends, high and low bay fixtures, and lighting controls. No application and no paperwork; the installation address and business name are given at checkout.

    Status note: Verified open 2026-08-25; no end date published. This is the province-wide fallback for a factory outside the BizEnergySaver Toronto/Ottawa footprint: smaller money than BizEnergySaver, but no application at all. Lighting controls were added to the eligible list starting January 1, 2025. Products must be installed at the end-use customer's facility within 90 days of purchase. Cannot be stacked with another Save on Energy incentive on the same lighting products.

    Electricity

    Official program pagesaveonenergy.caUpdated What this covers

  • ProvincialOntarioNo stated deadline

    Save on Energy: Peak Performance Program

    IESO (Independent Electricity System Operator), Ontario · Save on Energy Intake open

    Amount2026 rates: a performance incentive of $54,845.40/MW-season, plus a one-time enabling incentive of $20/kW ($20,000/MW) for equipment or services required to participate

    DeadlineNone stated on the source page

    A demand-response program that pays buildings to shed HVAC load on peak electricity demand days between June 1 and September 30. Participation requires access to interval data through the local utility's meters and sub-metering systems.

    Status note: Verified open 2026-08-25. Worth a warning: the eligible building list is commercial, institutional and municipal (warehouses qualify, a production line does not) and it explicitly excludes ICI (Class A) participants, so it and the Industrial Conservation Initiative entry are mutually exclusive: a factory picks one. Applications run January 1 to May 30 each year; the page notes "You can apply after May 30, however, performance incentives will be prorated based on the start date". Participants re-apply and update their contributor portfolio annually. The 2026 rates above are replaced when the 2027 season rates publish.

    Electricity

    Official program pagesaveonenergy.caUpdated What this covers

  • ProvincialOntarioNo stated deadline

    Save on Energy: Retrofit Program

    IESO (Independent Electricity System Operator), Ontario · Save on Energy Always open

    AmountUp to 50% of eligible project costs; Custom stream pays $1,800/kW or $0.20/kWh, whichever is higher; Prescriptive industrial EMIS pays $50,000 (facilities up to 400,000 GJ/yr) or $250,000 (above 400,000 GJ/yr); double incentive rates available in electricity-constrained regions (still capped at 50%)

    DeadlineNone stated on the source page

    Incentives for electricity-saving upgrades at industrial and commercial facilities (HVAC/chillers, lighting and controls, variable-speed drives, manufacturing equipment and solar PV) via prescriptive (set) and custom (measured-savings) streams. The prescriptive stream also funds installation of an industrial Energy Management Information System (EMIS), i.e. the metering and monitoring layer itself.

    Status note: Re-verified open 2026-08-25, with no pause, waitlist or deadline. The June 30, 2026 program update is now IN EFFECT (Solar DER small-to-medium cut from $860/kW to $770/kW, LED grow lights -10%, horticultural/network lighting controls -15%, new prescriptive Clean Water Pump measure at $15/HP). Rates are updated in spring and fall. Confirm current rates before applying. The industrial EMIS incentive is funded by NRCan through GIFMP; note the $250,000 tier needs more than 400,000 GJ/yr, so most mid-size factories qualify at the $50,000 tier. Regional adders (double the standard $0.20/kWh and $1,800/kW rates, still capped at 50% of eligible costs) apply only in listed electricity-constrained Forward Sortation Areas: parts of Niagara, Kingston, South Huron, Perth, Pembroke, Kenora, Waubaushene, Barrie/Muskoka, Elmira and Peterborough/Belleville. THE GTA IS NOT AMONG THEM, and eligibility is by the first three characters of the facility postal code. Source: https://www.saveonenergy.ca/en/For-Business-and-Industry/Programs-and-incentives/Local-Initiatives. Since November 2025 this is no longer the only industrial electricity option: Save on Energy XLerate replaced the Industrial Energy Efficiency Program at $300/MWh (against Retrofit’s $200/MWh) and adds feasibility-study funding Retrofit does not offer, so a large project should be compared against that entry first.

    ElectricityCompressed air

    Official program pagesaveonenergy.caUpdated What this covers

  • ProvincialOntarioNo stated deadline

    Save on Energy: Small Business Program

    IESO (Independent Electricity System Operator), Ontario · Save on Energy Intake open

    AmountNo cost to the business for an assessment, for eligible lighting upgrades up to $3,000, and for eligible non-lighting upgrades up to $2,500; up to $5,500 in direct-install incentives per business

    DeadlineNone stated on the source page

    Direct-install program: a free assessment, then a contractor installs eligible LED lighting, refrigeration upgrades and smart thermostats at no cost to the business up to the stated caps.

    Status note: Verified open 2026-08-25, applications being accepted, no end date published. The program states: "There is no cost to receive an assessment, or to have eligible lighting upgrades of up to $3,000 and non-lighting upgrades of up to $2,500 installed." The program is limited to businesses with 50 or fewer employees. Businesses that took part in the former Small Business Lighting, Refrigeration Efficiency, Business Refrigeration Incentive or RTUsaver programs may still qualify for further upgrades. Smart thermostat incentives are co-funded with Enbridge Gas.

    Electricity

    Official program pagesaveonenergy.caUpdated What this covers

  • ProvincialOntarioNo stated deadline

    Save on Energy: XLerate Program

    IESO (Independent Electricity System Operator), Ontario · Save on Energy Intake open

    AmountProject feasibility studies at 50% cost share; project incentives of $300/MWh of verified savings ($450/MWh in grid-constrained local areas), up to 75% of eligible project costs, to a maximum of $15 million per project

    DeadlineNone stated on the source page

    The IESO's large-scale electricity efficiency program for industrial process work; it cost-shares the feasibility study first, then pays on verified savings. Because incentives are paid against measured results, a baseline measurement and an M&V plan are required at application, before anything on the system is changed.

    Status note: Launched 20 November 2025 and confirmed open by the IESO's own launch notice: "Save on Energy's XLerate Program is now open and taking applications." It replaces the previous Save on Energy Industrial Energy Efficiency Program (IEEP). The $450/MWh grid-constrained rate is stated in the IESO launch notice (ieso.ca), not on the program page; the program page states only $300/MWh. Confirm the applicable rate with the provider. The program page publishes no intake window or deadline. Projects must be completed within five years of the Participant Agreement execution date, and participants must achieve at least 50% of anticipated savings to earn the incentive. The program requires baseline measurements: "Baseline measurement is still required prior to making any changes to the system to create the M&V plan at the application stage." Program Guide for Participants v2.0 is dated 11 May 2026.

    ElectricityCompressed air

    Official program pagesaveonenergy.caUpdated What this covers

  • ProvincialQuebecNo stated deadline

    ÉcoPerformance

    Gouvernement du Québec (Ministère de l'Environnement, Plan for a Green Economy) Intake status unconfirmed

    Amountvaries by stream (overview page states no fixed amounts; large industrial project streams carry multi-million-dollar caps)

    DeadlineNone stated on the source page

    Grants for energy-efficiency, energy-conversion and GHG-reduction projects at fossil-fuel-consuming sites, including implementation of energy management systems and building/process optimization.

    Status note: Active and extended to March 31, 2027; a new normative framework took effect July 7, 2026 (transitional filing measure until Aug 31, 2026); rules changed mid-2026, verify stream details at application time. Program information is available in French.

    Natural gasOther / multi-utility

    Official program pagequebec.caUpdated What this covers

  • Utility-runBritish ColumbiaNo stated deadline

    BC Hydro: Business energy-saving incentives (BESI)

    BC Hydro · BC Hydro Intake open

    AmountFunding rates vary by equipment, with past participants receiving an average of 40% of upfront costs. A 30% bonus incentive applies to projects submitted between June 3, 2025 and February 11, 2027.

    DeadlineNone stated on the source page

    Bonus rateEnds 11 Feb 2027

    Prescriptive incentives for one-for-one replacement or add-on upgrades of lighting, HVAC, refrigeration and mechanical equipment at smaller sites. Pre-approval through BC Hydro's CEM Hub is required before work starts.

    Status note: Verified open 2026-08-25: "30% bonus incentive on all business energy-saving incentives projects submitted between June 3, 2025 and February 11, 2027. To be eligible, projects must be completed by March 14, 2028." The small-site counterpart to Self-serve and Custom, under 500 MWh/yr here, over 500 MWh/yr there. February 11, 2027 is the bonus deadline, not the program closing date.

    Electricity

    Official program pagebchydro.comUpdated What this covers

  • Utility-runBritish ColumbiaNo stated deadline

    BC Hydro: Custom project incentives

    BC Hydro · BC Hydro Intake open

    AmountLevelized incentive rate of 2 to 5 cents/kWh for distribution customers and 4.5 cents/kWh for transmission customers; demand response at $50 to $75 per kW of demand reduced. A 30% bonus incentive applies to projects submitted between June 3, 2025 and February 11, 2027.

    DeadlineNone stated on the source page

    Bonus rateEnds 11 Feb 2027

    BC Hydro's custom stream for industrial and large-commercial efficiency, efficient-electrification and demand-response projects, paid at a levelized rate per kilowatt-hour saved. Most applicants run a funded feasibility study first.

    Status note: Verified open 2026-08-25 by a dated offer on the page: "We're currently offering a 30% bonus incentive for all custom project incentives projects submitted between June 3, 2025 and February 11, 2027." February 11, 2027 is the bonus deadline. The underlying program is ongoing, with no published closing date. There is a second date behind it: projects must be completed by March 14, 2028 to keep the bonus, which is the real planning constraint on a long capital project.

    Electricity

    Official program pagebchydro.comUpdated What this covers

  • Utility-runBritish ColumbiaNo stated deadline

    BC Hydro: Industrial electrification incentives

    BC Hydro · BC Hydro Intake status unconfirmed

    AmountFeasibility studies at 100% funding and resources, up to $100,000 towards the total cost of an energy study; project and pilot-project incentive amounts are determined case by case and are not published on the program page

    DeadlineNone stated on the source page

    Funds energy studies, fuel-switching capital projects and pilots for industrial customers moving fossil-fuel process loads onto electricity.

    Status note: Intake status is unconfirmed; contact BC Hydro before planning an application. Related program: the sibling "Facilities electrification fund" on the same site IS explicitly closed ("Applications for the facilities electrification fund are no longer accepted as funding has been fully subscribed"). Distinct from the CleanBC and BC Hydro Industrial Electrification Program, which is closed.

    ElectricityNatural gas

    Official program pagebchydro.comUpdated What this covers

  • Utility-runBritish ColumbiaNo stated deadline

    BC Hydro: Industrial Strategic Energy Management (Energy Manager, Cohort, Regional EM)

    BC Hydro · BC Hydro Intake status unconfirmed

    AmountEnergy manager salary reimbursed at 75% via performance contract (per BC Hydro program materials); study and project incentive amounts vary

    DeadlineNone stated on the source page

    Funding and expert support to embed energy management in industrial operations: co-funded on-site energy managers, peer cohort training, energy studies/audits and project incentives.

    Status note: Active; engage via Key Account Manager or the business help desk (1-866-522-4713).

    ElectricityOther / multi-utility

    Official program pagebchydro.comUpdated What this covers

  • Utility-runBritish ColumbiaNo stated deadline

    BC Hydro: Integrated energy audit and feasibility study funding

    BC Hydro · BC Hydro Intake status unconfirmed

    AmountUp to 100% funding for an energy expert to conduct an energy audit of the facility; the companion feasibility study offer also provides funding up to 100%

    DeadlineNone stated on the source page

    BC Hydro pays for a third-party audit that maps where a facility's energy goes and which systems offer the best efficiency, demand-reduction or electrification opportunities, then funds the deeper feasibility study on the options worth costing.

    Status note: Intake status is unconfirmed. Contact your Key Account Manager or Regional Energy Manager to confirm availability and apply. See also BC Hydro Industrial Strategic Energy Management.

    Electricity

    Official program pagebchydro.comUpdated What this covers

  • Utility-runBritish ColumbiaNo stated deadline

    BC Hydro: Self-serve incentives (lighting and compressed air systems)

    BC Hydro · BC Hydro Intake open

    AmountThe average incentive is about 25% of a project's cost, but for some projects it's upwards of 50%; a 30% bonus incentive applies to projects submitted between June 3, 2025 and February 11, 2027

    DeadlineNone stated on the source page

    Bonus rateEnds 11 Feb 2027

    Streamlined incentives for lighting systems of any size and compressed air systems of 40 to 300 horsepower at larger industrial and commercial sites. Eligible costs include equipment, installation, in-house labour, project management and disposal.

    Status note: The program page states "The average incentive is about 25% of a project’s cost, but for some projects it’s upwards of 50%". The current bonus offer is: "30% bonus incentive for all self-serve incentives projects submitted between June 3, 2025 and February 11, 2027", with projects completed by March 14, 2028. Requires an Alliance of Energy Professionals vendor system assessment and pre-approval through the CEM hub. February 11, 2027 is the bonus deadline. The program has no published closing date.

    ElectricityCompressed air

    Official program pagebchydro.comUpdated What this covers

  • Utility-runBritish ColumbiaNo stated deadline

    FortisBC: Commercial and industrial heating system optimization rebates

    FortisBC · FortisBC Intake status unconfirmed

    AmountRebates up to 75 per cent. Prescriptive amounts for boilers up to 150 hp: non-condensing economizer $10,000, condensing economizer $13,000, total dissolved solids blowdown control $4,000, combustion oxygen trim $16,000, parallel positioning $9,000. For 151 to 299 hp: $16,000, $20,000, $4,000, $18,000 and $10,000 respectively. A further tier applies to boilers of 300 hp and up.

    DeadlineNone stated on the source page

    Prescriptive rebates for optimizing existing gas boilers and related equipment, stack economizers, combustion oxygen trim, parallel positioning, blowdown control, heat and energy recovery ventilation, hydronic additives and tune-ups.

    Status note: Several of these measures ARE instrumentation rather than generic HVAC: combustion oxygen trim "measures the oxygen concentration in the flue gas and enables air supply adjustment based on real time measurements", and TDS blowdown control is a continuous-measurement retrofit. Status "unknown", with no intake or closure language on the page.

    Natural gas

    Official program pagefortisbc.comUpdated What this covers

  • Utility-runBritish ColumbiaNo stated deadline

    FortisBC: Commercial Energy Assessment Program

    FortisBC · FortisBC Intake status unconfirmed

    AmountFree

    DeadlineNone stated on the source page

    A free walkthrough energy assessment by a FortisBC-authorized consultant, delivered as a written report within 60 days, identifying low- and no-cost conservation measures, efficiency upgrades and the FortisBC rebates available for them.

    Status note: Intake status is unconfirmed. The page offers an application route: the rebate value tile reads "Free", there is an active "Start your rebate application" button behind an account login, and there is no closure notice anywhere on the page. "Allow at least 30 days to process your application."

    Natural gasElectricity

    Official program pagefortisbc.comUpdated What this covers

  • Utility-runBritish ColumbiaNo stated deadline

    FortisBC: Commercial Energy Management Program

    FortisBC · FortisBC Intake status unconfirmed

    AmountUp to $60,000

    DeadlineNone stated on the source page

    FortisBC funds an embedded energy specialist, energy analyst or thermal energy manager position at a large gas customer to develop and execute natural gas savings projects, designed to work alongside an existing BC Hydro energy manager on combined gas and electricity savings.

    Status note: For facilities managing both gas and electricity: preference is given to customers who already have a BC Hydro energy manager in place for six months or more, or a Strategic Energy Management Plan signed off by BC Hydro, so this and the existing BC Hydro Industrial Strategic Energy Management entry are designed to be taken together. The program also favours customers who have completed a FortisBC energy assessment. Terms are issued on acceptance and are described as non-negotiable. Status "unknown", live application and amount tile, no intake statement.

    Natural gas

    Official program pagefortisbc.comUpdated What this covers

  • Utility-runBritish ColumbiaNo stated deadline

    FortisBC: Custom Efficiency Program

    FortisBC · FortisBC Intake status unconfirmed

    AmountUp to 50% of the energy study cost; implementation funding to a maximum of up to $500,000 for commercial building or agricultural lighting projects, or up to $1.5 million for industrial facilities

    DeadlineNone stated on the source page

    Funding for detailed energy studies and custom natural-gas conservation projects at industrial, commercial and agricultural facilities (process heating, heat recovery, controls).

    Status note: Active. Funding limits: the page headline says "Up to $500,000" but the body sets the industrial cap at $1.5 million.

    Natural gas

    Official program pagefortisbc.comUpdated What this covers

  • Utility-runNew BrunswickNo fixed deadline

    Business Rebate Program

    NB Power · Save Energy NB Always open

    Amount25% back on energy efficient products and equipment, subject to a lifetime cap of $250,000 per eligible project site

    DeadlineRolling intake

    A fuel-agnostic prescriptive rebate paying a quarter of the cost back on efficient equipment, lighting, heating, cooling and ventilation, commercial kitchen equipment, and variable-speed-drive air compressors and pumping.

    Status note: Intake evidence: live "Apply Now" and "Register Online" routes plus the mandatory pre-approval instruction, "Please do not start the project or incur any costs until you have your pre-approval signed off by NB Power program staff to ensure eligibility." Unusually, it is FUEL-AGNOSTIC ("regardless of who your energy provider is, how you heat your business"), unlike the electricity-only Nova Scotia programs. Eligible equipment includes air compressors with variable-frequency drives. No stated deadline or intake window.

    ElectricityNatural gasCompressed airOther / multi-utility

    Official program pagesaveenergynb.caUpdated What this covers

  • Utility-runNew BrunswickNo fixed deadline

    Commercial Buildings Retrofit Program

    NB Power · Save Energy NB Always open

    AmountEnergy audits with completed measures: up to 100% of audit costs to a maximum of $3,000 (buildings up to 15,000 sq ft), $5,000 (15,001–75,000 sq ft) or $8,000 (over 75,001 sq ft); proof-of-payment only: up to 50% to a maximum of $1,100 / $2,200 / $3,300 by the same classes. Feasibility studies: up to 100% to a maximum of $1,100 / $2,200 / $3,300. Upgrades: electricity up to $250,000 per fiscal year at $120/GJ saved; non-electric fuels up to $1 million at 25% of eligible project costs.

    DeadlineRolling intake

    Pays for the energy audit and the feasibility study first (at up to 100% of cost, tiered by building size) then pays per gigajoule saved on the upgrades that follow. Delivered through approved Energy Management Service Providers who submit on the building owner's behalf.

    Status note: Intake evidence: live "Get started today!" and free energy walk-through sign-up, plus the non-electric stream's own wording, "Available until funds are depleted" on a "first come, first serve basis". The $1 million non-electric pot can empty mid-year with no notice, so confirm availability before scoping. A program guide v6.1 dated August 2022 is still linked from the site and its figures conflict with the live /incentives/ page; the amounts above come from the live page, and the PDF is out of date. Amounts are per fiscal year and per entity.

    ElectricityNatural gasOther / multi-utility

    Official program pagesaveenergynb.caUpdated What this covers

  • Utility-runNew BrunswickNo fixed deadline

    Industrial Energy Efficiency Program

    NB Power · Save Energy NB Always open

    AmountUp to $1 million for energy reduction projects. EMIS ladder: audits up to 100% of eligible costs to a maximum $20,000; design 50% to a maximum $35,000; implementation 50% to a maximum $80,000; optimization 50% to a maximum $30,000. Studies: small industry up to 100% to a maximum $20,000, large industry to a maximum $40,000. Projects: small industry $60/GJ up to 50% to a maximum $500,000; large industry $30/GJ up to 50% to a maximum $1,000,000. Training: 75% of eligible costs to a maximum $2,000 per site per year.

    DeadlineRolling intake

    NB Power's industrial program funds energy studies, capital projects, employee training and a four-stage Energy Management Information System track that pays separately for the EMIS audit, its design, its implementation and its optimization.

    Status note: A utility that names "energy management systems" as a funded activity and publishes a four-stage EMIS incentive ladder, starting with an EMIS audit at up to 100% of eligible costs. Intake confirmed from the program's own Terms and Conditions: "Incentives are offered on a first-come, first-served basis and are subject to the eligibility requirements outlined in the Guide, in addition to Program budget." No intake window or program-year end is published. Two caveats: "NB Power reserves the right, for any reason, to terminate the Program or change the Program requirements, Incentives or Terms and Conditions, at any time without notice", and "Projects must be completed within the timeframe listed on the Pre-Approval confirmation."

    ElectricityNatural gasCompressed airOther / multi-utility

    Official program pagesaveenergynb.caUpdated What this covers

  • Utility-runNewfoundland and LabradorCloses 31 Dec 2026

    Business Efficiency Program: Custom Solutions

    Newfoundland Power and Newfoundland and Labrador Hydro (takeCHARGE) · takeCHARGE Intake open · Deadline 2026-12-31

    Amount$0.10 per kWh of first-year energy savings up to a maximum of $100,000, plus a bonus incentive of $500 per kW of peak demand reduced; studies funded at 50% of audit costs to a maximum $3,000 and 75% of feasibility study costs to a maximum $5,000

    DeadlineDeadline 2026-12-31

    Newfoundland and Labrador's custom retrofit incentive: a no-cost energy assessment, then a rebate on measured first-year savings, currently topped up by a time-limited peak-demand bonus. Projects close out with formal measurement and verification.

    Status note: The program page says "This limited-time opportunity is available until December 31, 2026" and, separately, "All measures must be in-service by December 31, 2027 to qualify for the bonus incentive". It is NOT clear from the page whether December 31, 2026 ends the whole Custom Solutions program or only the $500/kW peak-demand bonus. Confirm with takeCHARGE whether the base $0.10/kWh rebate continues after December 31, 2026. Reported average rebate is "over $7,000" against the $100,000 maximum. Four-step process: no-cost energy assessment, project proposal, project development agreement, close-out with measurement and verification; the five-year persistence rule implies ongoing M&V.

    Electricity

    Official program pagetakechargenl.caUpdated What this covers

  • Utility-runNova ScotiaNo stated deadline

    Building Optimization

    EfficiencyOne (Efficiency Nova Scotia) · Efficiency Nova Scotia Intake status unconfirmed

    Amount100% of an investigation study cost, up to $5,000

    DeadlineNone stated on the source page

    Funds a recommissioning investigation study that finds low-cost operational fixes in existing building systems, then supports implementing them. Explicitly open to industrial facilities.

    Status note: Status "unknown", with no intake statement; the live route is "We consider eligibility on a case-by-case basis. Work with a contractor to apply for this program." The page's own claim for the approach: "Recommissioning can reduce whole-building energy usage by 5-15% on average", by "easy-to-implement, low-cost, low-risk operational changes". Electricity only, same as Custom Energy Retrofits. The program agreement must be signed before purchase. Payment follows measurement and verification. Unlike the Ontario EBCx equivalent, industrial facilities ARE named as eligible.

    Electricity

    Official program pageefficiencyns.caUpdated What this covers

  • Utility-runNova ScotiaNo stated deadline

    Business Energy Rebates

    EfficiencyOne (Efficiency Nova Scotia) · Efficiency Nova Scotia Intake open

    AmountUp to 50% of product costs in rebates, or interest-free financing for up to 24 months; the rebate is the amount listed in the rebate guide or up to 50% of the product purchase price, whichever is less

    DeadlineNone stated on the source page

    Prescriptive per-unit rebates on efficient equipment (LED lighting, HVAC, refrigeration and pumping) taken instantly at participating distributors or claimed by mail-in application after purchase.

    Status note: Verified open 2026-08-25 with live "Before You Buy", "at the counter" and "After You Buy" routes. New-construction lighting: "Beginning June 15, 2025, we will no longer accept applications for new construction lighting projects". Retrofit lighting is unaffected. Check the downloadable rebate guides for per-unit amounts. Instant and mail-in rebates are mutually exclusive on the same purchase.

    Electricity

    Official program pageefficiencyns.caUpdated What this covers

  • Utility-runNova ScotiaNo stated deadline

    Custom Energy Retrofits

    EfficiencyOne (Efficiency Nova Scotia) · Efficiency Nova Scotia Intake status unconfirmed

    AmountTotal project incentive typically $0.15/kWh; where a feasibility study incentive is taken, the implementation incentive is the total project incentive minus the study incentive

    DeadlineNone stated on the source page

    Engineered, custom electricity-reduction retrofits at commercial, institutional and industrial facilities, with optional feasibility-study funding folded into one project incentive. Incentives are paid after implementation and measurement and verification.

    Status note: Status "unknown" because the page states no intake and no closure; participation runs through two live application routes ("Retrofit Project Application - With Feasibility Study Incentive" and "..Without Feasibility Study Incentive"). Constraints quoted verbatim: "Project simple payback before incentives must fall between 1 and 15 years"; "Projects must be in the planning stages with no prior commitments or equipment purchased. New construction projects aren't eligible"; "The CPA must be signed by the business and Efficiency Nova Scotia before equipment is purchased or installed"; "Incentives are paid at the end of the project after the project measures have been implemented and Measurement & Verification has been completed." ELECTRICITY ONLY, "This program was created to support electricity reduction projects only", so a gas-side project earns nothing here. Stackable with other funders: "Yes. We'll consider other funding or incentives in our analysis."

    Electricity

    Official program pageefficiencyns.caUpdated What this covers

  • Utility-runNova ScotiaNo stated deadline

    Energy Management Services (Energy Managers and Strategic Energy Management)

    EfficiencyOne (Efficiency Nova Scotia) · Efficiency Nova Scotia Intake status unconfirmed

    Amountvaries (no amounts stated on the program page)

    DeadlineNone stated on the source page

    Places an energy manager inside the organization (fractional and shared, or embedded and full-time) or runs a Strategic Energy Management coaching engagement, with the cost carried by Efficiency Nova Scotia rather than the participant.

    Status note: Nova Scotia's analogue to the Ontario Expanded Energy Management Program and BC Hydro's Industrial SEM, and the industrial sector is named as eligible. The program includes: "Tracking and analyzing energy use within the context of operations." Funding amounts are not published. Funding is explicitly conditional, and the page says so: "Most energy management programs are funded through federal and provincial initiatives, though this is dependent on the availability of funding and the program model that's selected", and "Timing is dependent on available funding and staffing." Three delivery models: Fractional Energy Manager ("Most organizations using this model are able to reduce annual energy costs by 10-30%"), Embedded Energy Manager ("Agreements typically span 2-3 years"), and Strategic Energy Management. "Most agreements will be at least 18 months to ensure one capital planning cycle is included." Status "unknown", with no intake statement; entry is via a contact form.

    ElectricityOther / multi-utility

    Official program pageefficiencyns.caUpdated What this covers

  • Utility-runNova ScotiaNo stated deadline

    Pay-for-Performance

    EfficiencyOne (Efficiency Nova Scotia) · Efficiency Nova Scotia Intake status unconfirmed

    AmountAn incentive of $0.15/kWh based on verified first-year energy savings

    DeadlineNone stated on the source page

    A whole-building performance program that pays on savings verified from a year of interval meter data rather than from an engineering estimate. Entry requires a package of measures delivering at least a 10 percent electricity reduction.

    Status note: The program states: "the energy savings will be verified using interval meter data collected for one year after the installation." Intake status is unconfirmed; the page carries no intake statement and no closure notice; participation is via a live "select one of the following consultants from our Efficiency Preferred Partner network" route. Program conditions: at least a 10% electricity reduction is required and only electric savings count ("No, only the electric energy savings can be used to determine eligibility"); energy audits and feasibility studies are NOT funded ("no funding is allocated"); and it is NOT STACKABLE, "P4P participants are NOT eligible for other Efficiency Nova Scotia energy efficiency incentives or rebates. during the duration of the agreement." Single-measure projects are rejected and referred to the prescriptive rebates. Industrial facilities are not listed as eligible. Confirm eligibility with the provider before applying.

    Electricity

    Official program pageefficiencyns.caUpdated What this covers

  • Utility-runNova ScotiaNo stated deadline

    Small Business Energy Solutions

    EfficiencyOne (Efficiency Nova Scotia) · Efficiency Nova Scotia Intake open

    Amountvaries (no amounts stated on the program page), rebates are calculated from expected energy savings, with 24-month interest-free financing available on the Nova Scotia Power bill

    DeadlineNone stated on the source page

    Turnkey rebates plus interest-free on-bill financing for small commercial electricity customers. Applications are still being accepted and reviewed, but the 2026 budget is fully committed and new approvals are being paid out in 2027.

    Status note: Asked "Is the Small Business Energy Solutions (SBES) program still open?", the page answers "Yes. We continue to accept applications, and applications are reviewed in the order they are received." But it also carries this banner: "Funding for the Small Business Energy Solutions program is fully committed for 2026. Incentive payments for new projects preapproved in 2026 will be issued in 2027." So the work can be approved and completed now and the cheque arrives next year, "Most new pre-approvals are being issued with an Approved Program Year of 2027", and early payment "is not guaranteed". Pre-approvals expire "typically within 120 days of the pre-approval date", and a revision that increases a rebate can be pushed to the next program year.

    Electricity

    Official program pageefficiencyns.caUpdated What this covers

  • Utility-runNova ScotiaNo stated deadline

    Smart Synergy

    EfficiencyOne (Efficiency Nova Scotia) · Efficiency Nova Scotia Intake status unconfirmed

    Amount$100 for every kilowatt reduced, averaged across all events per season

    DeadlineNone stated on the source page

    A winter demand-response program: participants cut load (manually or automatically) during events called on high-demand days, and are paid on their average curtailment across the season. Participants get a real-time energy dashboard.

    Status note: Participants receive a dashboard: "You'll have access to a real-time dashboard that provides insights and monitoring on your facility's energy data and costs." Event structure verbatim: "Events can last up to four hours; either 7-11 am or 5-9 pm weekdays, excluding holidays. There can be up to 12 events per winter season", with notification "by 4 pm the day before an event" and possible cancellation up to two hours before. Status "unknown", with no intake statement on the page. The program is seasonal and has no published enrolment cutoff. Confirm availability before the winter season.

    Electricity

    Official program pageefficiencyns.caUpdated What this covers

  • Utility-runOntarioCloses in 50 days · 13 Nov 2026

    Enbridge Gas: Industrial Custom Program

    Enbridge Gas (Ontario) · Enbridge Gas Intake open · Deadline 2026-11-13

    AmountManufacturing: $0.30/m³ of annual gas saved for the first 50,000 m³, then $0.20/m³; capped at 75% of incremental project costs to a maximum of $250,000 per project

    DeadlineDeadline 2026-11-13

    Custom incentives and engineering support for industrial natural-gas efficiency retrofits (boilers, heat recovery, steam systems, process heating and similar projects) paid per cubic metre of gas saved.

    Status note: Re-verified open 2026-08-25; amounts unchanged. Incentives apply to measures implemented AND commissioned between Jan. 1 and Nov. 13 of the current calendar year (Nov 13, 2026 for this cycle) and projects must be pre-approved by Enbridge Gas before installation. The page says "current calendar year", not 2026, so this deadline rolls every January. Enbridge notes programs can change or be cancelled without notice.

    Natural gas

    Official program pageenbridgegas.comUpdated What this covers

  • Utility-runOntarioCloses in 67 days · 30 Nov 2026

    Enbridge Gas: Industrial Studies & Assessments

    Enbridge Gas (Ontario) · Enbridge Gas Intake open · Deadline 2026-11-30

    AmountUp to 50 percent of the cost of an energy assessment; maximum incentive by annual gas consumption, 300,000–3 million m³: $6,000; 3–10 million m³: $10,000; below 300,000 m³ and above 10 million m³: individually assessed

    DeadlineDeadline 2026-11-30

    Cost-shares the engineering study that finds the savings (steam trap surveys, process improvement studies, air balance studies and, explicitly, metering installations) at industrial and agricultural natural gas facilities. It is the study-stage companion to the Industrial Custom Program that funds the fix.

    Status note: Verified open 2026-08-25. Eligible assessments include "metering installations", with cost sharing of up to 50%. Enbridge's own manufacturing page frames the same offer as "Energy assessments and meters: up to 50 percent of eligible costs". Assessment projects must be "completed between Jan. 1 and Nov. 30 of the current calendar year"; the page says "current calendar year", not 2026, so this deadline ROLLS EVERY JANUARY, exactly like the Industrial Custom entry. Pre-approval is mandatory: obtain confirmation of acceptance before carrying out the assessment. Enbridge notes its "Connect with an Energy Solutions Advisor" form was experiencing technical issues at retrieval, phone contact may be needed.

    Natural gas

    Official program pageenbridgegas.comUpdated What this covers

  • Utility-runOntarioCloses in 37 days · 31 Oct 2026

    Enbridge Gas: Prescriptive Incentive Program (equipment upgrades)

    Enbridge Gas (Ontario) · Enbridge Gas Intake open · Deadline 2026-10-31

    AmountSet per-unit incentives, for example $200 per adaptive thermostat, $300 per pedestrian air curtain, $650–$1,650 per dock door seal, $1,000/unit for a hybrid rooftop unit up to 32 kBtu/hr, $3,000–$4,000 per destratification fan, $0.50–$1.25/CFM for an HRV capped at $200–$5,000 per unit, $0.04/lb for ozone laundry to a $15,000 maximum per system. The incentive cannot exceed 50 percent of the project cost and $100,000 per project.

    DeadlineDeadline 2026-10-31

    Fixed per-unit incentives on off-the-shelf gas-saving equipment: destratification fans, dock door seals, air curtains, condensing make-up air, hybrid rooftop units, heat and energy recovery ventilators, demand control ventilation and adaptive thermostats. No engineering study needed.

    Status note: Verified open 2026-08-25. The 2026 window is quoted verbatim on the page: "Equipment purchased between Jan 1, 2026, and Sept 30, 2026, and installed and operational no later than Oct 31, 2026", so the recorded deadline is the INSTALLATION date, the purchase gate is a month earlier (Sept 30, 2026), and both roll every January. Allow eight weeks for payment. Enbridge notes programs can change or be cancelled without notice.

    Natural gas

    Official program pageenbridgegas.comUpdated What this covers

  • Utility-runQuebecNo stated deadline

    Énergir: Energy Management System grant

    Énergir · Énergir Intake status unconfirmed

    AmountImplementation: up to $175,000; tracking/continuous improvement: $0.50/m³ of gas saved up to $1,000,000 (combined max $1,175,000)

    DeadlineNone stated on the source page

    Funds implementation of an industrial energy management system (including performance tracking, monitoring, and measurement & verification) then pays ongoing incentives per cubic metre of gas saved.

    Status note: Active; can be stacked with Hydro-Québec's aligned EMS offer, directly relevant to gas submetering/monitoring projects.

    Natural gasOther / multi-utility

    Official program pageenergir.comUpdated What this covers

  • Utility-runQuebecNo stated deadline

    Énergir: Major Industries energy efficiency grants

    Énergir · Énergir Intake status unconfirmed

    AmountFeasibility study and implementation: up to $1,000,000; recommissioning up to $100,000; solar air preheating up to $200,000

    DeadlineNone stated on the source page

    Grants plus personalized engineering advice for large industrial gas customers: feasibility studies and implementation of measures such as heat recovery, steam-network optimization and heating optimization; also recommissioning and solar air preheating.

    Status note: Active.

    Natural gas

    Official program pageenergir.comUpdated What this covers

  • Utility-runQuebecNo stated deadline

    Hydro-Québec: Efficient Solutions Program (Programme Solutions efficaces)

    Hydro-Québec · Hydro-Québec Intake status unconfirmed

    AmountEfficient equipment: up to 90% of eligible costs; energy analysis support up to $60,000

    DeadlineNone stated on the source page

    Financial support for electricity-efficiency projects in commercial, institutional and industrial buildings: efficient equipment (simplified option via the OSE tool), custom/complex projects, and energy analyses.

    Status note: Active; a refreshed program version (OSE 6.0) took effect March 31, 2026; check current measure lists in the OSE tool.

    Electricity

    Official program pagehydroquebec.comUpdated What this covers

  • MunicipalNova ScotiaNo fixed deadline

    Wastewater Rebate

    Halifax Water (Halifax Regional Water Commission) Always open

    Amountvaries (no fixed amount published); the difference between the volume of water purchased and the volume of wastewater discharged becomes the basis for the wastewater rebate value

    DeadlineRolling intake

    An annual rebate for industrial and commercial customers whose water never reaches the sewer, evaporated in cooling towers, or incorporated into product. The claim is built from twelve consecutive months of measured water-in and wastewater-out data.

    Status note: The claim requires measured water-use and wastewater data. "The customer collects 12 consecutive months of data and submits it to Halifax Water for review and payment", and "An application for a wastewater rebate must be submitted to Halifax Water within six months after the end of the 12-month data period." "Requests for rebate must be made annually." Potential applications include breweries, food and beverage factories, and facilities with cooling towers. Status "rolling" is inferred from the recurring annual mechanism and a live submission form; the page carries no explicit intake statement. Pre-approval involves a site assessment of private water and wastewater systems, usually including a site visit. Submit via the online form plus supporting data to customercare@halifaxwater.ca.

    Water

    Official program pagehalifaxwater.caUpdated What this covers

  • MunicipalOntarioNo stated deadline

    Capacity Buyback Program

    City of Toronto (Toronto Water) Intake status unconfirmed

    AmountOne-time rebate up to $0.30 per litre of water saved per average day

    DeadlineNone stated on the source page

    A free water audit plus a one-time cash rebate for ICI process-water reductions (cooling towers, boilers, refrigeration, greywater/rainwater reuse and other process measures).

    Status note: The page was updated in December 2025 but does not confirm current intake. Confirm availability at savewater@toronto.ca before planning an application.

    Water

    Official program pagetoronto.caUpdated What this covers

  • MunicipalOntarioNo stated deadline

    Energy Retrofit Loans (ERL)

    City of Toronto Intake status unconfirmed

    AmountFinancing for up to 100 per cent of project costs at a rate equal to the City's cost of borrowing, with repayment terms up to 30 years and up to one year interest free and payment free

    DeadlineNone stated on the source page

    Not a grant. Long-term, low-interest City financing covering up to the full cost of low-carbon retrofits in Toronto buildings, including lighting, high-efficiency boilers, chillers and HVAC, heat pumps, building automation and controls, envelope work and renewables.

    Status note: No intake window or closure stated at retrieval; applications start through the City's Better Buildings Navigation Resource Hub. Industrial facilities and lighting upgrades are eligible. Loan conditions: it is DEBT, not a grant; the interest rate tracks the City's cost of borrowing and varies daily, and is confirmed only on approval; and the 60-per-cent-by-2040 decarbonization plan is a substantial piece of engineering work, so this is a fit for an owner already committed to a decarbonization pathway, not for a one-off lighting swap. Authorized third parties may apply on the owner's behalf.

    ElectricityNatural gas

    Official program pagetoronto.caUpdated What this covers

  • MunicipalOntarioNo stated deadline

    ICI Capacity Buyback Incentive Program

    York Region Intake status unconfirmed

    AmountUp to $50,000 for eligible water-saving retrofits

    DeadlineNone stated on the source page

    Free facility water-use profile with customized recommendations, plus financial incentives for water-saving retrofits at high-water-use industrial, commercial and institutional businesses.

    Status note: Active; first-come, first-served and subject to annual program funding availability.

    Water

    Official program pageyork.caUpdated What this covers

  • MunicipalOntarioNo stated deadline

    Industrial Water Rate Program (Block 2 rate)

    City of Toronto (Toronto Water) Intake status unconfirmed

    Amount2026 Block 2 rate $3.3219/m³ vs. general rate $4.8629/m³ (~30% reduction) on consumption over 5,000 m³/yr

    DeadlineNone stated on the source page

    Not a grant but an ongoing ~30% discounted water/wastewater rate on industrial process water above 5,000 m³/year, in exchange for maintaining an approved water conservation plan.

    Status note: Active; the required conservation plan and annual reporting are a natural fit for metering/monitoring services.

    Water

    Official program pagetoronto.caUpdated What this covers

  • MunicipalOntarioNo stated deadline

    Water efficiency for industrial businesses (free water audit)

    Region of Peel Intake status unconfirmed

    AmountFree water audit; no financial incentive amounts are stated on the program page

    DeadlineNone stated on the source page

    A free water audit for industrial facilities in Peel Region that identifies water-saving opportunities, most commonly replacing water-cooled systems with air-cooled equivalents and eliminating once-through water use.

    Status note: Peel covers Mississauga, Brampton and Caledon. NO CASH INCENTIVE IS PUBLISHED: the page offers the audit only ("A free water audit can identify cost-saving opportunities") and states no rebate, so Peel does not pay for the retrofit itself. The page publishes no status or deadline and its case studies date from 2017-2019, so confirm the program is still running before planning around it. Apply by emailing publicworkscustserv@peelregion.ca. Peel, York and Toronto are the only three GTA municipalities currently running ICI water programs.

    Water

    Official program pagepeelregion.caUpdated What this covers

  • MunicipalOntarioNo stated deadline

    Water Efficient Technology (W.E.T.) Program

    Region of Waterloo Intake status unconfirmed

    Amount50% cost-share on water audits/consulting up to $10,000; project funding based on water saved and project cost

    DeadlineNone stated on the source page

    Funding and free technical support for industrial/commercial/institutional water-conservation projects: water-use reviews, leak detection, water balance audits and retrofit funding tied to water saved.

    Status note: Active; start by emailing watercycle@regionofwaterloo.ca for a free water-use review.

    Water

    Official program pageregionofwaterloo.caUpdated What this covers

  • MunicipalOntarioNo stated deadline

    Water Smart Business Program

    City of Guelph Intake status unconfirmed

    Amount50% of a third-party water audit up to $10,000; capital incentive of $750 per m³/day of water saved, up to $100,000 per project

    DeadlineNone stated on the source page

    Free water-use reviews, audit rebates and capital incentives for permanent water-conservation retrofits at Guelph businesses.

    Status note: Active (page updated December 2025; new case studies published through 2026).

    Water

    Official program pageguelph.caUpdated What this covers

Selecting a province also includes national programs. Check each program’s eligibility and last-reviewed date.

Most applications want a number you don’t have yet.

Many applications need a baseline of current use and an estimate of savings. We help your team gather the measurements needed to prepare the application.

63 programs · updated 2026-08-25

Book a site visitRun the numbers

or call 1-833-QUANTFY (1-833-782-6839)